Never enough clamps

Well, the vice leg glue-up seems to have been unaffected by its shower, and it’s now a suitably beefy leg (by which I mean, it’s now large enough to look comically too large for the benchtop. Oh well, it won’t be the only thing that’ll look funny about this by the time I’m done I suspect). There wasn’t much time for the rest of the week to do much work (so I occupied myself by buying more tools. Why did nobody tell me this was a sickness you could catch? What the hell did I need a #6 for? Well, other than for preparing smaller boards that didn’t really need the #7, and for filling the space in the tool cabinet between the #5½ and the #7…. though maybe a T5 would help with the symmetry… Oh, for pete’s sakes!).… Read the rest

Read More

Scrubbing, flattening and beefy legs

A full weekend day without rain. Wow. I mean. I’d heard legends but… just wow.
So I immediately took full advantage of the day by sleeping late. Crud.
And before doing anything with the bench, I hauled out the grinder and reground the bevels on my #7 after an earlier argument with a knot:

And since I was doing that, I reground the camber on my scrub plane to make it a little more aggressive:

I may need to rename that thing Sid.… Read the rest

Read More

Could have been worse…

So today I was a bit under the weather (which is a polite way of saying that I was having a philosophical dispute with something I ate and was conducting a brexit poll of my own) and working from home (which is a polite way of saying that if you work in IT, being confined to where the king goes alone is not enough to get you out of work because we invented both the laptop and wifi). So over lunch I took the clamps off the core of the benchtop glueup to see would it immediately fall apart (because as we all know, a litre of titebond II regularly fails to hold wood together). … Read the rest

Read More